Program hub · October 2026

STM-01 Technology Transfer
and GMP Manufacturing

Moving the 50 L STM-01 process to Made Scientific's East Norriton facility for Phase 3 clinical supply: how the transfer works, what we prove first, and what the program costs. Prepared by Made Scientific for Secretome Therapeutics.

Defy Limits. Deliver Results.

Secretome Therapeutics × Made Scientific · Proposal 23645-2026 · Confidential, under mutual NDA

Start here

The program on one page

Where STM-01 stands, what Made Scientific proposes, and how the move is de-risked. Each panel links to the detail.

STM-01 today

Where the program stands

What the public record and Secretome's answers to our questionnaire tell us about STM-01, and what Phase 3 asks of the manufacturing site.

Phase 2THRIVE-2 in DMD cardiomyopathy, opened 29 September 2026
50 Lstirred-tank microcarrier process developed with RoosterBio
6–10Phase 3 batches Secretome anticipates
INDactive, amended in 2025 to describe this process

STM-01 in brief

  • Allogeneic neonatal cardiac progenitor cells, given by intravenous infusion. The effect is attributed to what the cells secrete, with anti-inflammatory and anti-fibrotic activity.
  • Duchenne muscular dystrophy cardiomyopathy: THRIVE-2, a multicenter, multi-dose, open-label Phase 2, opened on 29 September 2026.
  • Heart failure with preserved ejection fraction: Phase 1 data presented at HFSA on 11 October 2026, with FDA Fast Track designation since March 2025.
  • Dilated cardiomyopathy: an investigator-sponsored Phase 1 at Emory University.

Manufacturing so far

  • RoosterBio took the process from 2D flasks to a 50 L stirred-tank microcarrier process and completed a full-scale run in 2025.
  • Cellipont, part of Kincellis since September 2026, manufactured the master cell bank and is making Phase 2 material.
  • The seed train runs 7 days in T-225 flasks and HYPERflasks, expansion 5 days in the Sartorius BIOSTAT STR 50 L, then a 1-day harvest and fill into OriGen CS250 bags.
  • The process is not yet locked. Secretome plans to lock it before Phase 3, and the potency assay is in development.

What Phase 3 asks of the manufacturing site

  • A locked process, with the potency assay transferred and on the certificate of analysis.
  • Comparability between Phase 2 and Phase 3 material, planned before the first GMP lot rather than after it.
  • Capacity for 6 to 10 batches, and automated fill and finish at full batch scale.
  • Stability data that supports the shelf life, and a site that can carry the program into commercial supply.

Transfer plan

How we de-risk bringing STM-01 to East Norriton

Whether East Norriton becomes a second Phase 3 site or the primary one, the transfer has to be proven before it is relied on. The plan is built so Secretome sees evidence before it commits, Phase 2 supply continues undisturbed, and Phase 3 material is comparable by design.

Evidence first

Proof before commitment

Two full-scale 50 L runs on STM-01 cells in Milestone 1, the confirmation run filled on the ARES X20+ and reported for Secretome's approval. The proposed commitment structure follows.

Capital

No equipment purchase for Secretome

Made Scientific buys, installs and qualifies the two ARES X20+ fillers and the Unifuge Pilot. The fillers carry a vendor-confirmed lead time of about 12 weeks and are ordered at contract execution, so they stay off the critical path.

Continuity

A direct line to the process developer

RoosterBio developed the 50 L process, and Made Scientific works with RoosterBio under a technology and supply partnership. Secretome contracts with Made Scientific directly and decides what is shared.

Comparability

Planned from the first run

The Technology Transfer Plan sets the comparison to Phase 2 material from the start: the same release panel and characterization on Made Scientific's runs and on Phase 2 retains, with the potency method added when Secretome transfers it. Scope agreed with Secretome.

Yield

Recovery measured at every step

The feasibility and confirmation runs record cell recovery from harvest through the mesh, the Unifuge wash and formulation, so any change rests on data. Our development team works with the Unifuge and can support Secretome's parameter work now.

Communication

One team, visible every week

A dedicated program manager; weekly program calls, a biweekly Joint Project Team and a quarterly Joint Steering Committee; person-in-plant in both directions. Program management fees are waived through technology transfer.

Transfer plan

The transfer package, and how we make it easy

What moves from Secretome and its current manufacturer to East Norriton, and how our team gets first-hand knowledge of the process before the first run.

Process

Documents at current scale

Process description, batch records, process development reports and critical process parameters; the sampling plan and an example CoA; the bill of materials and equipment.

Methods and materials

What the laboratories need

Method protocols, historical performance and reference standards; Phase 2 retains for comparability; master cell bank vials supplied by Secretome.

People

Person-in-plant, both ways

Our process development and MSAT specialists can observe a run at Secretome's current manufacturer during transfer planning, or host Secretome's team at East Norriton for a workshop and the development runs.

Proposed commitment structure

Proof first: Milestone 1 as the first commitment

Secretome has said it will sign once Made Scientific has executed the entire batch process at full scale on STM-01 cells. Milestone 1 is built to do exactly that, so we propose to make it the first commitment.

Milestone 1 as issued

    Work Orders 4.0 and 5.0 both run at full 50 L working volume. The confirmation run takes STM-01 to filled drug product on the ARES X20+ and ends with a report for Secretome's approval.

    How the commitment would work

    1. Commit to Milestone 1 now, at , invoiced per work order: half at initiation, half on deliverables.
    2. Two full-scale runs on STM-01 cells: feasibility, then confirmation through fill and finish, with the data shared as they come.
    3. Stage Gate 1.1 becomes Secretome's decision point. The initial deposit of and Milestones 2 and 3 commit there.
    4. If the data show the process is not ready to lock, optimization work is scoped and priced before anyone proceeds, as the proposal already provides.

    Fees are unchanged from the proposal. This moves the deposit from execution of the first agreement to Stage Gate 1.1, and is subject to the definitive agreement.

    Process

    The STM-01 process at East Norriton

    Eight unit operations as set out in Appendix A of the proposal, with the critical materials, the in-process controls and the room each runs in.

    Durations are representative estimates pending MSAT confirmation. The wash and concentration device is shown as the Unifuge Pilot per the current transfer assumption; the final device is confirmed at Technology Transfer Planning (WO 2.0). Chain of identity and chain of custody are maintained across all steps.

    Analytics and release

    Release testing, method transfer and stability

    The release panel as proposed, executed on cryopreserved drug product, and the work orders that transfer and qualify each method.

    WO 3.0

    Method transfer

    Secretome's methods come into Analytical Development first and are confirmed on STM-01 material from the development runs. Adventitious virus testing is outsourced to a qualified laboratory.

    WO 8.0

    Method qualification

    Quality Control qualifies each method on STM-01 material for GMP release, phase-appropriately under ICH Q2(R2): viable cell count, immunophenotype, sterility, mycoplasma, endotoxin, appearance and extractable volume.

    Potency

    Transferred from Secretome

    The potency assay is in development at Secretome and will be locked for Phase 3. Its transfer and qualification are scoped by change order once the method details are shared.

    WO 10.0

    Stability

    A real-time study to 36 months on engineering-run material, seven timepoints, with T=0 taken from release data. Post-thaw in-use stability is performed elsewhere.

    Site

    East Norriton, Pennsylvania

    Made Scientific's clinical-to-commercial facility outside Philadelphia, at 2900 Potshop Lane, where the STM-01 suite would sit.

    85,000square feet, from development to commercial supply
    8Grade B/C cleanroom suites
    1Grade C closed-system ballroom
    1dedicated Grade B fill and finish suite
    STM-01 suite layout at East Norriton: fill and finish, seed and culture, support, cryopreservation and staging rooms

    The STM-01 suite

    • Seed and culture roomSartorius BIOSTAT STR 50 L and tower, Unifuge, seed train in biosafety cabinets and stacked incubators, NC-200, scales.
    • Fill and finish roomTwo Xiogenix ARES X20+ fillers flanked by two biosafety cabinets. Grade B.
    • Cryopreservation roomThree controlled-rate freezers, −80 and −20 °C freezers, 2–8 °C storage, LN2, cryo cart.
    • Material and staging roomFlexible staging and support work surfaces.
    Open the suite view

    Representative suite model from the proposal (layout Rev 1, 2 October 2026). Final room assignment and equipment placement are confirmed at Technology Transfer Planning (WO 2.0) and the site visit. A 3D fit-out of the bioreactor and fill and finish rooms is in preparation.

    East Norriton facility exterior

    2900 Potshop Lane, East Norriton

    Cleanroom suite, East Norriton

    Cleanroom suite

    Biosafety cabinet and incubators, East Norriton

    Biosafety cabinet and incubators

    Proposal 23645-2026 · Version 01

    Scope and service fees

    The work orders and fees as issued on 2 October 2026. Materials and third-party services are passed through at cost plus 15% and estimated separately.

    total service fees (fixed)
    Milestone 1: technology transfer and process confirmation
    Milestone 2: GMP readiness
    Milestone 3: GMP manufacture, batches at
    Milestones 1 and 2

    Per work order

    Half of each work order at initiation and half on submission of its deliverables.

    Milestone 3

    Per GMP batch

    Half at initiation, 30% after completion of manufacture and 20% on issue of the final CoA. Pass-through costs at cost plus 15%.

    Initial deposit

    Due on execution of the first governing agreement as issued; under the proof-first structure it moves to Stage Gate 1.1. Net 30, with 2% for payment in 10 days.

    Payment schedule in full
    Additional service fees

    Stage Gate 1.1 follows WO 5.0 and Stage Gate 2.1 follows WO 10.0. Program management is waived through technology transfer. Services are governed by the definitive agreements between the parties.

    Proposal 23645-2026 · Version 01

    Work orders and fees

    Timeline

    Representative program timeline

    As issued in the proposal, in months from program start. Calendar dates are set at contract execution, and durations start when client-supplied materials, inputs and approvals are in.

    Timeline

    Paths to an earlier first lot

    The proposal's timeline is representative. These are the places where time can come out, and the inputs that set the pace.

    Paths to an earlier first lot

    Where time can come out

    • Start analytical method transfer as soon as Secretome's method documents arrive, alongside transfer planning.
    • Observe a run at the current manufacturer in the first month, so the feasibility run starts from first-hand knowledge.
    • Order long-lead materials as soon as scope is agreed, so the development runs start on time.
    • Run aseptic process qualification and QC method qualification alongside the engineering runs, as planned.
    What sets the pace

    Inputs the later work orders depend on

    • A complete transfer package and master cell bank vials at the start.
    • The formulation and the wash and concentration device, settled before the confirmation run.
    • The potency method, transferred in time for qualification and release.
    • The process lock decision, and any optimization it calls for, ahead of the engineering runs.

    Team

    Made Scientific team

    The leadership and business development team for the STM-01 program, with the organizations each person worked for before joining Made Scientific.

    Open questions

    Questions to settle together

    Inputs that shape scope, price or timing. Most are Secretome's to answer; a few are joint.

    Next steps

    Next steps

    What it takes to start Milestone 1.

    1. Agree the proof-first structure. Milestone 1 as the first commitment; Stage Gate 1.1 as Secretome's decision point for the deposit and Milestones 2 and 3.
    2. Technical session with Secretome's process development and CMC leads to work through the open questions.
    3. Site visit to East Norriton, with the STM-01 suite walked room by room.
    4. Transfer package and person-in-plant. The document request list, and the observation run at the current manufacturer.
    5. Milestone 1 work orders under Made Scientific's terms, with the master services and quality agreements completed ahead of GMP readiness.